日本久久久久亚洲中字幕_久久精品国产亚洲高清_欧洲亚洲国产激情_国产免费一区二区三区久久久_国产在线精品一区二区不卡99_国产精品久久久久久久久鸭_亚洲日韩欧美婷婷综合久久_2022年精品久久久久精品_欧美影视精品久久_国产日韩欧美丝袜一区二区

當(dāng)前位置: 首頁(yè)>精品工程>軌道交通工程

深圳軌道交通8號(hào)線項(xiàng)目

發(fā)布時(shí)間:2018-11-09 來(lái)源:


  中交二公局負(fù)責(zé)深圳軌道交通8號(hào)線一期工程6站6區(qū)間12.367公里的施工任務(wù)。全線采用地下敷設(shè)方式,涵蓋了地鐵施工大部分工法,車(chē)站施工有明挖法、暗挖法、蓋挖順做法、蓋挖逆作法、半蓋挖法,區(qū)間隧道采用TBM法、盾構(gòu)、礦山法、明挖法等。
  CCCC Second Highway Engineering Co., Ltd. is responsible for the construction task of 12.367km in 6- station 6-section of the first phase of the Shenzhen Rail Transit Line No.8. The whole line adopts underground laying method, which covers most of the subway construction methods. There are open excavation method, hidden excavation method, cover excavation method, cover excavation method, half-cover excavation method, interval tunnels using TBM method, shield tunneling method, open excavation method and so on in station construction.
    

地址:西安市科技六路33號(hào) 郵編:(710065) 電話:+86-029-89560113 電子郵箱:zjegj@shbcccc.com
Copyright?2012中交第二公路工程局有限公司 版權(quán)所有All Rights Reserved
網(wǎng)站維護(hù):科技與數(shù)字化部  陜ICP備08105335號(hào)

  • 微信公眾號(hào)